Plumbing Finished

All the gas and water plumbing has been completed today and the external taps work :) Am not rapt with the way the gas pipe and a water pipe run on the outside of the garage. I realise that with a single leaf wall then this is the only way, but am hoping that some sort of cover is installed over the two of them.

AND

There was a site clean today, the back and the al fresco side have been cleaned of broken bricks and the general rubbish that accumulates, and neatly piled at the front of the house! :)

Now it's the sparkies' turn!!